PC-based special software is developed according to the customer and the application, which standard software cannot produce a solution.

  • Apart from standard SCADA software, simulation software is also made to see the feasibility of a project.
  • Thanks to the simulation, parameters such as daily production rate, number of personnel, energy consumption become clear during the project decision stage.
  • It is possible to monitor the system with software prepared for mobile devices such as phones and ipads.

Sample Projects


Sorter Simulation (Textile Industry)

  • A simulation was prepared for the sorter project in the textile industry.
  • The daily capacity was determined by changing the parameters of the parcel entry speed, the number of personnel, and the rate of removal of the parcel from the system.
  • As a result of the simulation, it was understood that the belt speeds were not sufficient and the speeds were increased before the production, the system worked without any problems at the predicted capacity.

Project Details

  • Client: Textile Company
  • Delivery Date: March 2010